Product Description
SINOTRUK Wuyue muck dump truck has the characteristics of light weight, low center of gravity, high strength, stability and reliability: the bottom and sides are made of domestic and foreign wear-resistant, high-strength plates such as NM450, 700L or hardox, with guaranteed strength; the interior of the truck is smooth, and the box The plate is integrally pressed, with high strength, light weight, beautiful appearance, and no material accumulation; the fully sealed top cover has good sealing effect and no spillage during transportation; It adopts dual control of manual operation and intelligent remote control, which is easy to operate, flexible and reliable; it is equipped with Beidou terminal to monitor the vehicle's running route, dumping location, etc. throughout the whole process, making it easy to manage.
Model |
ZZ3317V3847B1 |
Tyres |
12.00R20 Radial tyre |
Engine |
WP12.400 |
Cab |
HOWO76, Air-conditioner, single sleeping berth |
Maximum Output |
400HP |
Lifting system |
Front tipping |
Transmission |
HW19710, 10&2 gears |
Hydraulic cylinder |
HYVA or equal |
Front Axle |
VGD95 |
Cargo box dimension(L*W*H) |
7300*2300*1500mm |
Max. loading: |
9500kg*2 |
Thickness |
floor 10side 8mm |
Rear Axle |
MCP16 Ratio: 5.73 |
Cerb weight |
18200kg |
Max. loading: |
16000kg*2 |
GCW |
51000kg |
Steering |
BOSCH |
Overall size |
10350*2580*3450mm |






a
The procducts Analysis of the current situation and the way forward




Implementing program for models in cold area
1.Can be equipped with tail gas heating, with exhaust at the rear or upper part of the rear pillar, and a drainage outlet at the front of the auxiliary longitudinal beam to ensure smooth unloading at low temperatures.
2. Optional high-grade hydraulic accessories to ensure smooth operation at low temperatures.
3. Optional low-temperature materials to ensure performance in low-temperature conditions.
4. The rear protection can be adjusted to an adjustable structure according to actual working conditions.




Company Profile
Factory Display




Packaging & Shipping
FAQ
Q1.What is the Trade Term?
A1:FOB Main port in China, CIF
Q2.How many colors for selection?
A2:More than 30 colors. We will provide you the color card , pls choose your favorite from it.
Q3.How long is our Production leading time?
A3:within 30-50 days upon receive deposit
Q5.What is the Payment term?
A5:T/T or L/C at sight. 30% Deposit for start the production ,the balance before the shipment when goods are ready.